Application Case of A Sewage Treatment Plant in Beijing

Some sewage treatment center in Beijing is one of the infrastructures constructed to solve the sewage treatment problems in the town and its surrounding areas. It was formally completed and put into use in June 2009. At present, the central area of the town adopts a combined drainage system without sewage treatment facilities. The sewage is not treated and discharged into a river through the existing combined pipeline, causing great pollution to the existing water situation. With the further acceleration of urban construction, the population of the town is developing rapidly, and the amount of sewage is increasing day by day. In addition, in order to protect the city's water sources, as an important part of urban infrastructure, it’s necessary to construct sewage treatment plant in this town. A new artificial wetland will be built around the sewage treatment plant, and the treated water will be used as the source of the artificial wetland or discharged into a certain river. The project scale is 20000 m3/d in the near future and 30000 m3/d in the long term.

图片1 (6)

(plane figure of sewage treatment plant in Beijing)

The main structural building includes: inlet pump room (including grille room), cyclone grit chamber, sand washing room, surface exposure oxidation ditch, sedimentation tank, sludge pump room, sludge dewatering machine room and mud storage tank, sludge Storage sheds, UV disinfection channels, deodorization facilities and structures, and dosing rooms; other buildings and structures include main substation room, comprehensive building, fire pool and pump room, heat pump room, warehouse, maintenance room, and communication room. The comprehensive building is equipped with a central control room and a laboratory, which can effectively monitor and control various data. So that the on-site staff can adjust process parameters in a timely manner. Our center uses the oxidation ditch activated sludge method for secondary biological treatment of sewage, taking into account the requirements for phosphorus and nitrogen removal.

Using products:

CODG-3000  Online Chemical Oxygen Demand Analyzer
NHNG-3010  Online Ammonia Nitrogen Analyzer
TPG-3030        Online Total Phosphorus Analyzer
TNG-3020 Online Total Nitrogen Analyzer
TNO3G-3062 Online Nitrate Nitrogen Analyzer
ZDYG-2087A Online Total Suspended Solid Analyzer
ZDYG-2088Y/T   Online Turbidity Analyzer
pHG-2091 Online pH Analyzer
CL-2059A Online Chlorine Analyzer
图片2 (6)
图片2 (6)
图片3 (4)
图片3 (4)

Shanghai BOQU Instrument provides a combination of automatic monitoring and manual monitoring for this project, Automatic monitoring solves the company's self-operation and maintenance problems for the sewage treatment plant and ensures the stability and reliability of water quality during the company's treatment process. Manual monitoring entrusted Beijing Urban Drainage Monitoring Station carries out monitoring. Through comprehensive water quality monitoring and control function to ensure stable and reliable water quality.

prev
Application Case of A Sewage Treatment Plant in Tonglu, Zhejiang Province
Fermentation Process Monitoring Case of A Industrial Enterprise in Russian
next
Get in touch with us
Sales products
We have invested in the highest quality and standards. Our headset are current with trends and are of the newest technologies available.
no data
We are a comprehensive enterprise, specializing in the R&D, design, manufacturing, sales and operation and maintenance services of water quality process monitoring instruments and sensors.
Contact: Leon Lei
Tel: +86 18955928790
WhatsApp: +86 18955928790
Company Address: No. 118 Xiuyan Road, Pudong New Area, Shanghai, zip code: 201315, China
Copyright © 2025 BOQU | Sitemap Privacy Policy
Contact us
email
contact customer service
Contact us
email
cancel
Customer service
detect